PROJECTS / PRJ-2026-014 VERMOSA

Four systems across an estate, one contractor.

CABLE TRAY INSTALL, CLUBHOUSE · 07.2026
PROJECT DATA
PRJ-2026-014
CLIENT
Estate developer, Cavite
LOCATION
Vermosa, Imus, Cavite
TIMELINE
2025 to present, phased
SYSTEMS
SCS ACS FDAS CCTV
STATUS
ONGOING
CREW
Dispatched from Imus warehouse, 12 min out
Request a similar build
SEC-01 / CHALLENGE

Four bid packages, or one accountable contractor.

An estate clubhouse and its support buildings needed structured cabling, door access, fire detection, and CCTV, each with its own drawings, containment, and turnover requirements. Splitting the scope across four contractors would have meant four schedules on the same ceiling grid and no single owner for the punch list.

SEC-02 / APPROACH

Shared pathways, one design, phased pulls.

We designed the four systems on common containment: one tray plan, one riser, one grounding scheme. Cable pulls were phased to follow the fit-out trades, and every device location was coordinated on a single drawing set signed by our in-house engineers.

1
drawing set for all four systems
4
systems on shared containment
12min
crew response from Imus warehouse
SEC-03 / RESULT

One punch list, one turnover binder.

Completed phases have been certified and turned over with as-builts, test results, and permits in a single binder per building. The engagement continues on the next phase of the estate, with the same crews and the same drawing standards.

SEC-04 / SITE PHOTOS
CLICK TO ENLARGE
{{ ph.cap }}
{{ lightboxCap }}
CLICK ANYWHERE TO CLOSE
NEXT PROJECT
Fiber backbone certified for 10G. Pasay City, 21 days.
VIEW →
DSTCI
FORT BONIFACIO, TAGUIG · SEC-REGISTERED 2015 · WWW.DSTCI.COM.PH
Solutions Projects News Contact
← Directory